Product Description:
Scaffolding catwalk steel galvanized platform plank with hook is the main part of pipes & coupler scaffolding system. Pre-galvanized surfaces treatment provided the excellent appearance with sufficient durability in such applications where salty air or long-term weather exposures are inevitable.
Standard Size
WIDTH (MM) |
HEIGHT (MM) |
LENGTH (MM) |
THICKNESS (MM) |
HOOK(MM) |
210 |
45 | 600-2100 | 1.0-2.0 | 43/50 |
225 | 38 | 600-2100 | 1.0-2.0 | 43/50 |
240 | 45 | 600-2100 | 1.0-2.0 | 43/50 |
250 | 40 | 600-2100 | 1.0-2.0 | 43/50 |
250 |
50 | 600-2100 | 1.0-2.0 | 43/50 |
300 | 50 | 600-2100 | 1.0-2.0 | 43/50 |
420 |
45 | 600-2100 | 1.0-2.0 | 43/50 |
480 | 45 | 600-2100 | 1.0-2.0 | 43/50 |
500 | 50 | 600-2100 | 1.0-2.0 | 43/50 |
600 | 50 | 600-2100 | 1.0-2.0 | 43/50 |
Remarks: All items can be customized as per cutomers' requirements. |
Packing & shipping:
We offer the packing according to the customer requirement. The most popular packing is in bundles.
Why us?
Years production experience with extraordinary quality.
Qualified inspection group inspect each production step.
Professional engineer offers suggestions for customer's project.
OEM service is available.
Factory Pictures
Certification
Related Products:
FAQ:
1. Q: What's your MOQ(minimum order quantity)?
A: One full container.
2. Q: What's your packing methods?
A: Packed into bundle, and rest in bulk.
3. Q: What's your payment terms?
A: T/T 30% in advance & T/T 70% upon sending the copy of Bill of Lading, L/C 100%, or negotiate according to the order status.
4. Q: What's your delivery time?
A: 10-20 days after received the advance payment or L/C.
5. Q: Are you manufacturer or trader?
A: We are the munafacturer of SCAFFOLDINGS MATERIALS for years, coveraged every scaffolding systems.
6. Q: Where's your factory?
A: Our factory is in Dongguan city (near Shenzhen) and Tianjin city (ner Beijing)
7. Q: Can we visit your factory?
A: Warmly welcome. Once we have your schedule, we will arrange the professional sales team to follow up your case.
8. Q: Can you supply other scaffolding materials?
A: Yes. All related scaffolding materials.
(1) scaffolding system (ring lock system, frame, pipe&coupler system)
(2) scaffolding pipes (1.5'-2.0')x(0.3-12m), hop dipped galvanized / black. BS1139, STK500
(3) steel pipes (ERW BS1387, SSAW PIPE, Sqaure/ Rectangular tube GB/T6728)
(4) steel coupler (preesed / drop forged)
(5) steel plank with / without hooks
(6) steel stair case
(7) screw adjustable base jack
(8) adjustable props
Thank you, welcome to your inquiry.