Galvanized Drop Forged Scaffold Joint Beam Clamp

Galvanized Drop Forged Scaffold Joint Beam Clamp

Galvanized drop forged scaffold joint f beam clamp Scaffolding Coupler is the main part of the tubular scaffolding system, it supplys a fasten and conect functions in system. Simple struction and big loading power, make couplers easier and widely used by scaffolders on construction project. We...

Chat Now

Product Details

Galvanized drop forged scaffold joint fbeam clamp

Scaffolding Coupler is the main part of the tubular scaffolding system, it supplys a fasten and conect functions in system. Simple struction and big loading power, make couplers easier and widely used by scaffolders on construction project.

We have different types and sizes scaffolding couplers, such as fixed coupler, swivel coupler, ladder beam coupler, Sleeve coupler...

 

Benefits of Tubular Scaffolding:
1. Easy To Use. These scaffolds are easy to use, only four basic components are required such as tube, right angle coupler, swivel coupler, bases or casters.
2. Durability. These types of scaffolds are durable, galvanized tubes and couplers are able to take on harsh environments.
3. Ease in Assembly and Dismantling. Tubular scaffolds can be assembled easily and dismantled, saving time on site.
4. Light in Weight. The tubular system can be easily moved around the construction site.
5. Adaptability. In comparison to other scaffolds, tube and fittings system offer the most adaptable and efficient scaffold solutions.
6. Cost Effectiveness. In cases when scaffolds need to be erected for long periods of time (more than four weeks), tube and fitting system scaffolds provide the most cost effective scaffold solutions.
7. Flexibility. Tubular scaffolds are one of the most flexible types of scaffolds. These scaffolds can be adjusted according to the desired height.
8. Longer Life Span. Tubular system scaffolds have a longer life span in comparison to other scaffolds and offer more sturdy work platforms.

British Type Couplers

Description

Specification

Weight

Standard

Drop Forged Fixed Coupler

48.3/60.3mm

0.98kg

BS1139/EN74

Drop Forged Swivel Coupler

48.3/60.3mm

1.12kg

BS1139/EN74

Drop Forged Girder Coupler

48.3mm

1.48kg

BS1139/EN74

Drop Forged Putlog Coupler

48.3mm

0.63kg

BS1139/EN74

Drop Forged Joint Pin

48.3mm

1.12kg

BS1139/EN74

Pressed Sleeve Coupler

48.3mm

0.97kg

BS1139/EN74

Pressed Board Retaining Coupler

48.3mm

0.61kg

BS1139/EN74

Pressed Limpet Coupler

48.3mm

0.32kg

BS1139/EN74

Detailed Images

Packing & Delivery

Packing details

The most popular packing is 25pcs/bundle, 30pcs/bundle, 40pcs/bundle.

We could offer the packing according to the customer requirement. 

Certification

 We have ISO:9001,14001,18001certifications and SGS/TUV test report for scaffolding products .

Our Company

Gainford Construction Materials (Dongguan) Limited

Founded in 2002, which is a group company of World Plaza Engineering Limited (Hongkong). Our company is located in Dongguan City, Guangdong Province, China, covers an area of 35000 square meters, Adjacent to Shenzhen, the amphibious transportation is convenient .
Mainly engaged in research and development, production and sales of construction scaffolding with hardware products. Our scaffolding products mainly include: Ringlock System scaffolding, Frame Scaffolding, Steel Planks, Couplers, Props, Steel Tubes and Scaffolding Accessories.

Our Team

Our Service

Related Products

      FAQ:
      1. Q: What's your packing methods?

          A: Packed in bundle or bulk (customed is accept).

 

      2. Q: What's your delivery time?

          A: 7-10 days after received the advance payment .


      3. Q: Are you manufacturer or trader?

          A: We are the manufacturer of construction materials fo several years ,Gainford do domestic and export business.


      4. Q: Where's your factory?
          A: Our factory is in Dongguan city (near Shenzhen) afforded enough production ability and earlier delivery time.

 

      5. Q: Can we visit your factory?
          A: Warmly welcome. Once we have your schedule, we will arrange the professional sales team to follow up your case.


      6. Q: Can you supply other scaffolding materials?
          A: Yes. All related construction materials. 

     (1) scaffolding system ( ring lock system, scaffolding steel frame, pipe&coupler system)  

     (2) scaffolding pipes (1.5'-2.0')x(0.3-12m), hot dipped galvanized/Pre-galvanized /black. BS1139

     (3) steel pipes (ERW steel pipes, Square/ Rectangular tube ,black annealed steel tube)
     (4) steel coupler (pressed/drop forged coupler)
     (5) steel plank with hooks or without hooks
     (6) steel stair case
     (7) screw adjustable base jack

 

Previous:ECHAFAUDAGE DACCES, TRADITIONNEL ET CROISILLON Next:British Type Joint Clamp Pressed Pipe Clamp

Inquiry