High Quality steel ringlock scaffolding for working platform
Indroduction & Advantages------
High Quality steel ringlock scaffolding for working platform, it's advantages make ringlock scaffolding system are becoming more and more popular currently, the advantages are as below:
1. Easy for erection and dismantlement, convenient and can save much time & labor.
2. Compared with cuplock can save 1/3 steel around, save time & time & labor.
3. With good look in project image
Specifications------
Model# | O.D(mm) | Thickness(mm) | Length(m) | Type | Finish | Weight(kg) |
GFRLS001 | 48.3 | 3.25 | 1.0 | without sleeve | HDG | 4.61 |
GFRLS001 | 48.3 | 3.25 | 2.0 | without sleeve | HDG | 9.22 |
GFRLS001 | 48.3 | 3.25 | 3.0 | without sleeve | HDG | 13.83 |
GFRLS002 | 48.3 | 3.25 | 1.0 | with sleeve | HDG | 5.35 |
GFRLS002 | 48.3 | 3.25 | 2.0 | with sleeve | HDG | 9.96 |
GFRLS002 | 48.3 | 3.25 | 3.0 | with sleeve | HDG | 14.57 |
Production process------
Packaging & Shipping
High Quality steel ringlock scaffolding for working platform can be packed iron pallet or ringlock standard & ledger structure with steel strip, good look package style and convenient for loading and unloading.
Company Information
Certificates------
Applications------
High Quality steel ringlock scaffolding for working platform can be widely used in many scaffold engineering projects, such as bridge, tunnel, viaduct, water tower, power plant, oil refinery, etc
Our Services
Gainford advantages & supportings------
1. HIGH QUALITY PRODUCTS-We are the Hongkong Enterprise, we focus on the high quality control at all times. We have professional production team, can produce qualified every piece products for you!
2. THE LOWEST & COMPETITIVE PRICES- We sincerely do business with every customer with suporting you the lowest prices, make you become more competitive in your fierce competitions, help to create value & profit for you. We'd love to make friends with you! You happy then we are happy.
3. PUNCTUAL DELIVERY TIME- We are the Hongkong Enterprise,our factory is in Dongguan, very closed to Shenzhen port, from Shenzhen to your port can save half vessel time than any China North port. ,can reach your promotion season and no-delay for your constrution time.
We sincerely hope to cooperate with you, our dear friends!
Any enquiries are appreciated~ Let's to be your warehouse in China!!!
FAQ
1. Q: What's your MOQ(minimum order quantity)?
A: One full container.
2. Q: What's your packing methods?
A: Packed into bundle, and rest in bulk.
3. Q: What's your payment terms?
A: T/T 30% in advance & T/T 70% upon sending the copy of Bill of Lading, L/C 100%, or negotiate according to the order status.
4. Q: What's your delivery time?
A: 10-20 days after received the advance payment or L/C.
5. Q: Are you manufacturer or trader?
A: We are the munafacturer of SCAFFOLDINGS MATERIALS for years, coveraged every scaffolding systems.
6. Q: Where's your factory?
A: Our factory is in Dongguan city (near Shenzhen) and Tianjin city (ner Beijing)
7. Q: Can we visit your factory?
A: Warmly welcome. Once we have your schedule, we will arrange the professional sales team to follow up your case.
8. Q: Can you supply other scaffolding materials?
A: Yes. All related scaffolding materials.
(1) scaffolding system (ring lock system, frame, pipe&coupler system)
(2) scaffolding pipes (1.5'-2.0')x(0.3-12m), hop dipped galvanized / black. BS1139, STK500
(3) steel pipes (ERW BS1387, SSAW PIPE, Sqaure/ Rectangular tube GB/T6728)
(4) steel coupler (preesed / drop forged)
(5) steel plank with / without hooks
(6) steel stair case
(7) screw adjustable base jack
(8) Adjustable props