America Standard scaffolding dimensions standards
Gainford Equipment ( Dongguan ) Ltd. founded in 2002, which is a group company of World Plaza Engineering Limited (Hongkong). Our company is located in Dongguan City, Guangdong Province, China, covers an area of 35000 square meters, Adjacent to Shenzhen, the amphibious transportation is convenient .
Ring-Lock Scaffolding System consists of hot dipped galvanized steel pipe and modular components that are assembled together using integral wedge connectors. Gainford Ring-Lock system is a modular scaffold system which can provide major saving in labor cost while meeting the demands for safety, ease of handling and reductions in maintenance.
Standard: EN BS12811, EN BS12800, AS/NZS 1576
Feature: 1.Time efficient during assembly and dismantling .
2.Safe and simple one-man assembly
3.No loose parts
4.Maintenance free.
Item Name |
Specification(mm) |
Steel Grade |
Standard |
Ringlock Ledger |
48.3*3.25/3.0/2.75/2.5*300 |
Q345/Q235 |
EN BS12811, EN BS12800, AS/NZS1576 |
Ringlock Ledger |
48.3*3.25/3.0/2.75/2.5*600 |
Q345/Q235 |
EN BS12811, EN BS12800, AS/NZS1576 |
Ringlock Ledger |
48.3*3.25/3.0/2.75/2.5*900 |
Q345/Q235 |
EN BS12811, EN BS12800, AS/NZS1576 |
Ringlock Ledger |
48.3*3.25/3.0/2.75/2.5*1200 |
Q345/Q235 |
EN BS12811, EN BS12800, AS/NZS1576 |
Ringlock Ledger |
48.3*3.25/3.0/2.75/2.5*1500 |
Q345/Q235 |
EN BS12811, EN BS12800, AS/NZS1576 |
Ringlock Ledger |
48.3*3.25/3.0/2.75/2.5*1800 |
Q345/Q235 |
EN BS12811, EN BS12800, AS/NZS1576 |
Ringlock Ledger |
48.3*3.25/3.0/2.75/2.5*2100 |
Q345/Q235 |
EN BS12811, EN BS12800, AS/NZS1576 |
Detailed Images
Packing & Delivery
Certifications
Our Company
Our Team
Our Service
FAQ
1. Q: What's your MOQ(minimum order quantity)?.
A: One full container
2. Q: What's your packing methods?
A: Packed into bundle, and rest in bulk.
3. Q: What's your payment terms?
A: T/T 30% in advance & T/T 70% upon sending the copy of Bill of Lading, L/C 100%, or negotiate according to the order status.
4. Q: What's your delivery time?
A: 10-20 days after received the advance payment or L/C.
5. Q: Are you manufacturer or trader?
A: We are the munafacturer of scaffolding matetials for years, coveraged every scaffolding systems.
6. Q: Can you supply other scaffolding materials?
A: Yes. All related scaffolding materials.
(1) scaffolding system (ring lock system, frame, pipe&coupler system)
(2) scaffolding pipes (1.5'-2.0')x(0.3-12m), hop dipped galvanized / black. BS1139, STK500
(3) steel pipes (ERW BS1387, SSAW PIPE, Sqaure/ Rectangular tube GB/T6728)
(4) steel coupler (preesed / drop forged)
(5) steel plank with / without hooks
(6) steel stair case
(7) screw adjustable base jack