Frame Scaffolding step ladders with hook
Product Description
Scaffolding steel staircase for ringlock system, frame scaffolding system and cuplock system.
1) Materials: Q195 or Q235
2) Surface treatment: Pre-galvanized, Galvanized or Hor Dip Galvanized
3) Hook: with 43/50 or without hooks
4) OEM service available
5) We can also make as your drawings
6) Easy to erect and dismantle, can gain the working space and improve the efficiency.
Standard Size
Width (mm) |
Length (mm) | Height (mm) | Hook (mm) |
420/450 | 1829 | 1725 | 43 |
420/450 |
1829 | 1955 | 43 |
860 | 1829 | 1725 | 43 |
860 | 1829 | 1955 | 43 |
860 | 1800 | 1800 | 50 |
550 |
1800 | 2000 | 50 |
Remark : All styles of products can be customized according to the requirement of customer . |
Packaging & Shipping
We could offer packing service according to customers' requirement . The most popular packing is 10 pcs/ bundle.
Our Services
· Years production experience with extraordinary quality.
· Qualified inspection group inspect each production step.
· Professional engineer offers suggestions for customer's project.
· OEM service is available.
Company Information
Gainford Equipment (Dongguan) Ltd. was founded in 2002, is a wholly owned subsidiary of World Plaza Engineering Limited(HongKong), is one of the largest steel tube & scaffolding R&D, manufacturering and trading group company in China, located in Dongguan, Guangdong, covers an area of 35000 squares meters, adjacent to Shenzhen Port(the biggest port of China Southern), transportation convenient.
Factory
Certification
Related Products
FAQ
1. Q: What's your MOQ(minimum order quantity)?
A: One full container.
2. Q: What's your packing methods?
A: Packed into bundle, and rest in bulk.
3. Q: What's your payment terms?
A: T/T 30% in advance & T/T 70% upon sending the copy of Bill of Lading, L/C 100%, or negotiate according to the order status.
4. Q: What's your delivery time?
A: 10-20 days after received the advance payment or L/C.
5. Q: Are you manufacturer or trader?
A: We are the munafacturer of SCAFFOLDINGS MATERIALS for years, coveraged every scaffolding systems.
6. Q: Where's your factory?
A: Our factory is in Dongguan city (near Shenzhen) and Tianjin city (ner Beijing)
7. Q: Can we visit your factory?
A: Warmly welcome. Once we have your schedule, we will arrange the professional sales team to follow up your case.
8. Q: Can you supply other scaffolding materials?
A: Yes. All related scaffolding materials.
(1) scaffolding system (ring lock system, frame, pipe&coupler system)
(2) scaffolding pipes (1.5'-2.0')x(0.3-12m), hop dipped galvanized / black. BS1139, STK500
(3) steel pipes (ERW BS1387, SSAW PIPE, Sqaure/ Rectangular tube GB/T6728)
(4) steel coupler (preesed / drop forged)
(5) steel plank with / without hooks
(6) steel stair case
(7) screw adjustable base jack
(8) Adjustable props