Basic Info
Model NO.: SM-prop
Type: Adjustable
Framework: Straight up
Lapping Form: High Formwork
Move Method: Disassemble
Construction Properties: Building Scaffold
Business Type: Manufacture in Guangzhou, South of China
Certificate: SGS Test for Loading Capacity
Duty Type: We Can Make Light Duty, MID-Duty, and Heavy Duty
Working Life: 4-6 Years Normally
Load-Bearing: 1-2ton/Piece
Specification: ASTM STANDARD, SGS TEST FOR LOADING CAPACITY
HS Code: 730840000
Material: Steel
Structural Style: Multi-Pole Scaffolding
Supporting Mode: Floor Type Scaffolding
Erection Position: Internal Scaffolding
Scaffolding Part Type: Scaffolding Props
Item: Scaffolding Shoring Formwork Prop(Heavy
Feature: All Automatic Welded and Threaded
Service: OEM Service as Well
Application: Support System for Beam, Slab, Formwork, Concrete
Surface Treatment: Galvanized, DIP Painted, Powder Coated
Trademark: SHUANGMA
Origin: Guangdong, China
Product Description
The scaffolding Formwork Prop(heavy duty) is one of our main products which is with automatic welding technology, stable quality, uniform and smooth surface. We also have the SGS test for loading capacity in case you need.
Specification:
1. Main material: Steel Q235, Q345, Q195
2. Thickness: 1.6/1.8/2.0/2.2/2.5/3.0, as your request
3. Diameter(Inner-outer tubes): Light duty 40-48mm, MID Duty 48-56/58mm, Heavy duty 48-60mm
4. Adjustable length: For each duty, we can make the different sizes for different market.
Regular lengh is 1600-2900mm/1800-3200mm/2000-3500mm/2200-4000mm/2700-4500mm
5. Color: Customised, normally we make it red(Dark red and Farrari red), yellow, green, blue and silver.
6. Surface finish: Customised, HDG, Powder coated(lead free powder), Galvanised or DIP Paint. Our DIP paint finish has been high approved by our big customers.
7. Function: It is used for construction supporting, timber, formwork, concrete slab and so on. It is very easy and reliable to use.
Pictures:
PACKAGING&DELIVERY
1. Package: Normally in bulk can be loaded 22-24tons in one 20ft container
2. In bundle: Normally 40-50PCS/bundle, the total loading quantity will be little less than in bulk.
3. Delivery: Normally 25-30days after your order confirmation, we can contact in detail.