Main Walk Through Galvanized Frame Scaffolding

Main Walk Through Galvanized Frame Scaffolding

Quick Details: Place of Origin: Guangdong, China (Mainland) Brand Name: Gainford Material: Q195, Q235 Type: Frame Scaffolding System Certificate: SGS O.D: 42.3mm, 48.3mm Port: Shenzhen, China thickness: 1.6-2.4mm Surface treatment: Hot Dip Galvanized, Pre-galvanized, Painted, Black Color:...

Chat Now

Product Details

 

Quick Details: 

Place of Origin: Guangdong, China (Mainland)      Brand Name: Gainford

Material: Q195, Q235                                              Type: Frame Scaffolding System                                      

Certificate: SGS                                                        O.D: 42.3mm, 48.3mm

Port: Shenzhen, China                                              thickness: 1.6-2.4mm

Surface treatment: Hot Dip Galvanized, Pre-galvanized, Painted, Black

Color: Galvanized or any other colors as your request

popular size: 1219*1930, 1219*1700, 1219*152

Application: Building construction, ship building, tunnel etc

 

Product description: 

Frame Scaffolding System is one of the most popular system in construction. Mainly contains frame, cross brace, joint pin and catwalk.Easy installation, safety and stability. 

 

Advantages:

1)Good quality refer to JIS standard processing technology;

2)Surface treatment is hot dipped galvanized,pre-galvanized or painted;

3)Frame scaffolding is easy to install and remove, strong loading capacity, safe and reliable;

4)Widely used for projects of building, bridge,viaduct,tunnel,equipment installtion,ship maintenance and decoration.

 

Specification:

        Width(mm)     Height(mm)       O.D/Thickness (mm)                     Finish      

1219

1930 42*2.2/25*1.5 HDG/Pre-galvanized/Painted

1219

1700 42*2.2/25*1.5 HDG/Pre-galvanized/Painted
1219 1524 42*2.2/25*1.5 HDG/Pre-galvanized/Painted
1219 1219 42*2.2/25*1.5 HDG/Pre-galvanized/Painted
1219 914 42*2.2/25*1.5 HDG/Pre-galvanized/Painted
914 1930 42*2.2/25*1.5 HDG/Pre-galvanized/Painted
914 1700 42*2.2/25*1.5 HDG/Pre-galvanized/Painted
914 1524 42*2.2/25*1.5 HDG/Pre-galvanized/Painted
914 914 42*2.2/25*1.5 HDG/Pre-galvanized/Painted

 

Packing:

Usually 60pcs/bundle for main frame, 29pcs/ ladder frame,100pairs or 900pairs / bundle for cross brace. We could also offer the packing according to the customer requirement. 

 

Why us?

1) Years production experience with extraordinary quality.

2) Qualified inspection group inspect each production step.

3) Professional engineer offers suggestions for customer's project.

 

FAQ: 

1) Q: What's your MOQ(minimum order quantity)? 

   A: One full container.

2) Q: What's your packing methods? 

   A: Packed into bundle, and rest in bulk.

3) Q: What's your payment terms?

   A: T/T 30% in advance & T/T 70% upon sending the copy of Bill of Lading, L/C 100%, or negotiate according to the order status. 

4) Q: What's your delivery time?

   A: 10-20 days after received the advance payment or L/C. 

5) Q: Are you manufacturer or trader?

   A: We are the munafacturer of SCAFFOLDINGS MATERIALS for years, coveraged every scaffolding systems.

6) Q: Where's your factory?

   A: Our factory is in Dongguan city (near Shenzhen) and Tianjin city (ner Beijing) 

7) Q: Can we visit your factory?

   A: Warmly welcome. Once we have your schedule, we will arrange the professional sales team to follow up your case. 

8) Q: Can you supply other scaffolding materials?

   A: Yes. All related scaffolding materials, such as:

   scaffolding system (ring lock system, frame, pipe&coupler system).

   scaffolding pipes (1.5'-2.0')*(0.3-12m), hop dipped galvanized / black. BS1139, STK500.

   steel pipes (ERW BS1387, SSAW PIPE, Sqaure/ Rectangular tube GB/T6728).

   steel coupler (preesed / drop forged).

   steel plank with / without hooks.

   steel stair case.

   screw adjustable base jack.

   Adjustable props.

 

Thank you.

Previous:H Ladder Frame Scaffolding System Next:Kwikstage System Scaffolding To Australia New Zealand Africa

Inquiry